W

Wayne Lawrence Electrical Contractors in Derby

Derby·Solar Installation
ResidentialCommercial

34+ yrs

Experience

20 km

Service radius

1-10

Employees

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About Wayne Lawrence Electrical Contractors

Family-run Derby solar installer with 35+ years of electrical experience, NICEIC approved and MCS accredited since 1992

Derby, DE73 6TG

Derby DE73 6TG

Services Offered

Solar InstallationBattery Storage

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

MCSTrustMark

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

DerbyChellastonShardlowMelbourneCastle DoningtonSwadlincote

Customer Reviews

No reviews yet. Be the first to review Wayne Lawrence Electrical Contractors!

Write a Review

Frequently Asked Questions

How do I get a quote from Wayne Lawrence Electrical Contractors?

You can request a quote through the form on this page or contact Wayne Lawrence Electrical Contractors directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Wayne Lawrence Electrical Contractors serve?

Wayne Lawrence Electrical Contractors is based in Derby and serves within a 20 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Wayne Lawrence Electrical Contractors hold?

This profile lists the following reported certifications: MCS, TrustMark. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Wayne Lawrence Electrical Contractors offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Wayne Lawrence Electrical Contractors for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Wayne Lawrence Electrical Contractors for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Wayne Lawrence Electrical Contractors handle permits and paperwork?

The exact scope is not verified on this profile. Ask Wayne Lawrence Electrical Contractors which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded1992
Employees1-10
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Wayne Lawrence Electrical Contractors

Send your project details to request follow-up from Wayne Lawrence Electrical Contractors. Response timing and consultation terms are set by the company.

For Wayne Lawrence Electrical Contractors

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
W

Wayne Lawrence Electrical Contractors

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.