3

365 Energy Ltd in Exeter

Exeter·Solar Installation
ResidentialCommercial
0

60 km

Service radius

1-10

Employees

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About 365 Energy Ltd

Exeter-based solar and renewable energy specialists with 20 years of industry experience

Exeter, EX2 7JS

Exeter EX2 7JS

Services Offered

Solar InstallationBattery StorageEV ChargingMaintenance

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

MCSTrustATrader

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

ExeterTivertonNewton AbbotExmouthSidmouth

Customer Reviews

No reviews yet. Be the first to review 365 Energy Ltd!

Write a Review

Frequently Asked Questions

How do I get a quote from 365 Energy Ltd?

You can request a quote through the form on this page or contact 365 Energy Ltd directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does 365 Energy Ltd serve?

365 Energy Ltd is based in Exeter and serves within a 60 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does 365 Energy Ltd hold?

This profile lists the following reported certifications: MCS, TrustATrader. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does 365 Energy Ltd offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask 365 Energy Ltd for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask 365 Energy Ltd for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does 365 Energy Ltd handle permits and paperwork?

The exact scope is not verified on this profile. Ask 365 Energy Ltd which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Request a Quote

Business Details

0
Employees1-10
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from 365 Energy Ltd

Send your project details to request follow-up from 365 Energy Ltd. Response timing and consultation terms are set by the company.

For 365 Energy Ltd

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
3

365 Energy Ltd

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.