2

2020 Solar PV in Worcester

Worcester·Solar Installation
ResidentialCommercial

16+ yrs

Experience

50 km

Service radius

1-10

Employees

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About 2020 Solar PV

Award-winning MCS and RECC-accredited solar installer based in Worcestershire since 2010

Worcester, WR8 9LW

Worcester WR8 9LW

Services Offered

Solar InstallationBattery Storage

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

MCSRECC

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Batteries

Pylontech

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

WorcesterPershoreEveshamUpton upon SevernTewkesburyMalvern

Customer Reviews

No reviews yet. Be the first to review 2020 Solar PV!

Write a Review

Frequently Asked Questions

How do I get a quote from 2020 Solar PV?

You can request a quote through the form on this page or contact 2020 Solar PV directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does 2020 Solar PV serve?

2020 Solar PV is based in Worcester and serves within a 50 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does 2020 Solar PV hold?

This profile lists the following reported certifications: MCS, RECC. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does 2020 Solar PV offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask 2020 Solar PV for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask 2020 Solar PV for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does 2020 Solar PV handle permits and paperwork?

The exact scope is not verified on this profile. Ask 2020 Solar PV which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Request a Quote

Business Details

Founded2010
Employees1-10
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from 2020 Solar PV

Send your project details to request follow-up from 2020 Solar PV. Response timing and consultation terms are set by the company.

For 2020 Solar PV

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
2

2020 Solar PV

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.