W

Wattson Home Solutions in Worcester

Worcester, Massachusetts·Solar Installation
Residential

18+ yrs

Experience

80 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Wattson Home Solutions

Mass Save's Home Energy Partner for Central Massachusetts — solar installation, insulation, and energy efficiency since 2008

Worcester, Massachusetts 01608

Worcester, Massachusetts 01608

Services Offered

Solar InstallationBattery StorageMaintenance

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

Mass Save Partner

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

Canadian Solar

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Worcester, MassachusettsAuburn, MassachusettsShrewsbury, MassachusettsHolden, MassachusettsLeicester, MassachusettsMillbury, Massachusetts

Customer Reviews

No reviews yet. Be the first to review Wattson Home Solutions!

Write a Review

Frequently Asked Questions

How do I get a quote from Wattson Home Solutions?

You can request a quote through the form on this page or contact Wattson Home Solutions directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Wattson Home Solutions serve?

Wattson Home Solutions is based in Worcester and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Wattson Home Solutions hold?

This profile lists the following reported certifications: Mass Save Partner. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Wattson Home Solutions offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Wattson Home Solutions for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Wattson Home Solutions for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Wattson Home Solutions handle permits and paperwork?

The exact scope is not verified on this profile. Ask Wattson Home Solutions which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2008
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Wattson Home Solutions

Send your project details to request follow-up from Wattson Home Solutions. Response timing and consultation terms are set by the company.

For Wattson Home Solutions

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
W

Wattson Home Solutions

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.