1

1 Sun Solar Electric in Las Vegas

Las Vegas, Nevada·Solar Installation
ResidentialCommercial

19+ yrs

Experience

80 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About 1 Sun Solar Electric

Las Vegas commercial and residential solar installer specializing in solar PV and LED lighting since 2007

Las Vegas, Nevada 89109

Las Vegas, Nevada 89109

Services Offered

Solar InstallationSolar DesignMaintenance

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

NV Contractor License

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Las Vegas, NevadaHenderson, NevadaNorth Las Vegas, NevadaBoulder City, Nevada

Customer Reviews

No reviews yet. Be the first to review 1 Sun Solar Electric!

Write a Review

Frequently Asked Questions

How do I get a quote from 1 Sun Solar Electric?

You can request a quote through the form on this page or contact 1 Sun Solar Electric directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does 1 Sun Solar Electric serve?

1 Sun Solar Electric is based in Las Vegas and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does 1 Sun Solar Electric hold?

This profile lists the following reported certifications: NV Contractor License. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does 1 Sun Solar Electric offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask 1 Sun Solar Electric for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask 1 Sun Solar Electric for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does 1 Sun Solar Electric handle permits and paperwork?

The exact scope is not verified on this profile. Ask 1 Sun Solar Electric which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2007
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from 1 Sun Solar Electric

Send your project details to request follow-up from 1 Sun Solar Electric. Response timing and consultation terms are set by the company.

For 1 Sun Solar Electric

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
1

1 Sun Solar Electric

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.