U

UK Eco Energy Solutions in Lincoln

Lincoln·Solar Installation
ResidentialCommercial
0

80 km

Service radius

11-50

Employees

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About UK Eco Energy Solutions

MCS, NAPIT, and TrustMark certified solar and battery installers with 400+ verified reviews in Lincoln

Lincoln, LN6 3TA

Lincoln LN6 3TA

Services Offered

Solar InstallationBattery StorageEV ChargingMaintenance

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

MCSNAPITTrustMarkRECC

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Batteries

Duracell EnergyEbac

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

LincolnNorth HykehamSleafordNewarkGranthamNottingham

Customer Reviews

No reviews yet. Be the first to review UK Eco Energy Solutions!

Write a Review

Frequently Asked Questions

How do I get a quote from UK Eco Energy Solutions?

You can request a quote through the form on this page or contact UK Eco Energy Solutions directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does UK Eco Energy Solutions serve?

UK Eco Energy Solutions is based in Lincoln and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does UK Eco Energy Solutions hold?

This profile lists the following reported certifications: MCS, NAPIT, TrustMark, RECC. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does UK Eco Energy Solutions offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask UK Eco Energy Solutions for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask UK Eco Energy Solutions for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does UK Eco Energy Solutions handle permits and paperwork?

The exact scope is not verified on this profile. Ask UK Eco Energy Solutions which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Request a Quote

Business Details

0
Employees11-50
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from UK Eco Energy Solutions

Send your project details to request follow-up from UK Eco Energy Solutions. Response timing and consultation terms are set by the company.

For UK Eco Energy Solutions

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
U

UK Eco Energy Solutions

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.