TPS Eco in Maidstone
4+ yrs
Experience
1500+
Projects
40 km
Service radius
11-50
Employees
Profile information
About TPS Eco
MCS certified heat pump and solar panel installers serving Maidstone and all of Kent since 2022
Maidstone, ME15 9XA
Maidstone ME15 9XA
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
12yr
Inverter Warranty
10yr
Installation Warranty
Questions to Ask About Installation
Initial Consultation
Ask whether a site assessment is offered, what it covers, and whether it has a fee.
System Design
Request a design showing the proposed equipment, layout, assumptions, and itemized costs.
Permitting & Approval
Confirm who handles permits, inspections, and utility interconnection, and which fees are included.
Installation
Verify the installation team’s licenses, relevant certifications, and insurance.
Commissioning & Handover
Confirm the testing records, monitoring access, warranty registration, and support included in the handover.
Service Areas
Customer Reviews
No reviews yet. Be the first to review TPS Eco!
Frequently Asked Questions
How do I get a quote from TPS Eco?
You can request a quote through the form on this page or contact TPS Eco directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does TPS Eco serve?
TPS Eco is based in Maidstone and serves within a 40 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does TPS Eco hold?
This profile lists the following reported certifications: MCS, Gas Safe, RECC, F-Gas. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does TPS Eco offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask TPS Eco for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask TPS Eco for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does TPS Eco handle permits and paperwork?
The exact scope is not verified on this profile. Ask TPS Eco which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Business Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Similar Installers
Request a Quote from TPS Eco
Send your project details to request follow-up from TPS Eco. Response timing and consultation terms are set by the company.
For TPS Eco
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
TPS Eco