T

The Energy Box in Stoke-on-Trent

Stoke-on-Trent·Solar Installation
ResidentialCommercial

16+ yrs

Experience

50 km

Service radius

11-50

Employees

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About The Energy Box

Family-owned Staffordshire solar installer since 2010 with in-house roofing, electrical, and design teams

Stoke-on-Trent, WS15 3HQ

Stoke-on-Trent WS15 3HQ

Services Offered

Solar InstallationBattery StorageEV ChargingMaintenance

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

MCSTrustMarkNAPIT

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Stoke-on-TrentStaffordRugeleyLichfieldBurton upon TrentStaffordshire

Customer Reviews

No reviews yet. Be the first to review The Energy Box!

Write a Review

Frequently Asked Questions

How do I get a quote from The Energy Box?

You can request a quote through the form on this page or contact The Energy Box directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does The Energy Box serve?

The Energy Box is based in Stoke-on-Trent and serves within a 50 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does The Energy Box hold?

This profile lists the following reported certifications: MCS, TrustMark, NAPIT. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does The Energy Box offer?

Warranty terms are not documented on this profile. Ask The Energy Box for the equipment, workmanship, exclusions, transfer, and claim terms in writing.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask The Energy Box for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does The Energy Box handle permits and paperwork?

The exact scope is not verified on this profile. Ask The Energy Box which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded2010
Employees11-50
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from The Energy Box

Send your project details to request follow-up from The Energy Box. Response timing and consultation terms are set by the company.

For The Energy Box

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
T

The Energy Box

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.