S

Synergy Power Ltd in Coventry

Coventry·Solar Installation
ResidentialCommercial

14+ yrs

Experience

80 km

Service radius

11-50

Employees

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About Synergy Power Ltd

MCS-accredited solar PV and battery storage specialists based in Coventry, serving residential and commercial customers across the West Midlands

Coventry, CV1 2TE

Coventry CV1 2TE

Services Offered

Solar InstallationBattery StorageMonitoring

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

MCS

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

CoventryBirminghamWarwickLeamington SpaNuneatonRugby

Customer Reviews

No reviews yet. Be the first to review Synergy Power Ltd!

Write a Review

Frequently Asked Questions

How do I get a quote from Synergy Power Ltd?

You can request a quote through the form on this page or contact Synergy Power Ltd directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Synergy Power Ltd serve?

Synergy Power Ltd is based in Coventry and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Synergy Power Ltd hold?

This profile lists the following reported certifications: MCS. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Synergy Power Ltd offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Synergy Power Ltd for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Synergy Power Ltd for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Synergy Power Ltd handle permits and paperwork?

The exact scope is not verified on this profile. Ask Synergy Power Ltd which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded2012
Employees11-50
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Synergy Power Ltd

Send your project details to request follow-up from Synergy Power Ltd. Response timing and consultation terms are set by the company.

For Synergy Power Ltd

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
S

Synergy Power Ltd

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.