S

Sunlite Group in Ipswich

Ipswich·Solar Installation
ResidentialCommercial

8+ yrs

Experience

80 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Sunlite Group

Highly accredited family-run solar and renewable energy installer across Suffolk and Essex

Ipswich, IP12 4SD

Ipswich IP12 4SD

Services Offered

Solar InstallationBattery StorageEV ChargingMaintenance

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

MCSOZEV

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

IpswichWoodbridgeColchesterNorwichCambridgePeterborough

Customer Reviews

No reviews yet. Be the first to review Sunlite Group!

Write a Review

Frequently Asked Questions

How do I get a quote from Sunlite Group?

You can request a quote through the form on this page or contact Sunlite Group directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Sunlite Group serve?

Sunlite Group is based in Ipswich and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Sunlite Group hold?

This profile lists the following reported certifications: MCS, OZEV. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Sunlite Group offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Sunlite Group for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Sunlite Group for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Sunlite Group handle permits and paperwork?

The exact scope is not verified on this profile. Ask Sunlite Group which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2018
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Sunlite Group

Send your project details to request follow-up from Sunlite Group. Response timing and consultation terms are set by the company.

For Sunlite Group

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
S

Sunlite Group

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.