S

Stag Solar Solutions in Chelmsford

Chelmsford·Solar Installation
ResidentialCommercial

6+ yrs

Experience

700+

Projects

40 km

Service radius

1-10

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Stag Solar Solutions

Family-run MCS and ISO 9001 certified solar installer with 700+ installations across Chelmsford and Essex since 2020

Chelmsford, CM9 4UU

Chelmsford CM9 4UU

Services Offered

Solar InstallationBattery StorageMaintenance

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

MCSISO 9001RECC

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Batteries

SolarEdge

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

ChelmsfordMaldonHeybridgeBrentwoodBasildonColchester

Customer Reviews

No reviews yet. Be the first to review Stag Solar Solutions!

Write a Review

Frequently Asked Questions

How do I get a quote from Stag Solar Solutions?

You can request a quote through the form on this page or contact Stag Solar Solutions directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Stag Solar Solutions serve?

Stag Solar Solutions is based in Chelmsford and serves within a 40 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Stag Solar Solutions hold?

This profile lists the following reported certifications: MCS, ISO 9001, RECC. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Stag Solar Solutions offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Stag Solar Solutions for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Stag Solar Solutions for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Stag Solar Solutions handle permits and paperwork?

The exact scope is not verified on this profile. Ask Stag Solar Solutions which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2020
Employees1-10
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Stag Solar Solutions

Send your project details to request follow-up from Stag Solar Solutions. Response timing and consultation terms are set by the company.

For Stag Solar Solutions

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
S

Stag Solar Solutions

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.