SR2 Renewables in Chester
60 km
Service radius
2-10
Employees
Profile information
About SR2 Renewables
Tesla Powerwall certified solar, battery, and EV charging specialists based in Chester with over 20 years of experience
Chester, CH1 6AX
Chester CH1 6AX
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Reported Equipment Brands
Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.
Inverters
Batteries
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
12yr
Inverter Warranty
10yr
Installation Warranty
Questions to Ask About Installation
Initial Consultation
Ask whether a site assessment is offered, what it covers, and whether it has a fee.
System Design
Request a design showing the proposed equipment, layout, assumptions, and itemized costs.
Permitting & Approval
Confirm who handles permits, inspections, and utility interconnection, and which fees are included.
Installation
Verify the installation team’s licenses, relevant certifications, and insurance.
Commissioning & Handover
Confirm the testing records, monitoring access, warranty registration, and support included in the handover.
Service Areas
Customer Reviews
No reviews yet. Be the first to review SR2 Renewables!
Frequently Asked Questions
How do I get a quote from SR2 Renewables?
You can request a quote through the form on this page or contact SR2 Renewables directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does SR2 Renewables serve?
SR2 Renewables is based in Chester and serves within a 60 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does SR2 Renewables hold?
This profile lists the following reported certifications: MCS. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does SR2 Renewables offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask SR2 Renewables for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask SR2 Renewables for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does SR2 Renewables handle permits and paperwork?
The exact scope is not verified on this profile. Ask SR2 Renewables which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Business Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Similar Installers
Request a Quote from SR2 Renewables
Send your project details to request follow-up from SR2 Renewables. Response timing and consultation terms are set by the company.
For SR2 Renewables
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
SR2 Renewables