S

Spot On Solar in Derby

Derby·Solar Installation
ResidentialCommercialOff-Grid
0

50 km

Service radius

1-10

Employees

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About Spot On Solar

MCS-accredited Derbyshire solar installer offering PV, battery storage, off-grid and inverter repair services

Derby, DE23 3AH

Derby DE23 3AH

Services Offered

Solar InstallationBattery StorageMaintenance

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

MCS

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

DerbyLittleoverNottinghamLeicesterChesterfieldBurton upon Trent

Customer Reviews

No reviews yet. Be the first to review Spot On Solar!

Write a Review

Frequently Asked Questions

How do I get a quote from Spot On Solar?

You can request a quote through the form on this page or contact Spot On Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Spot On Solar serve?

Spot On Solar is based in Derby and serves within a 50 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Spot On Solar hold?

This profile lists the following reported certifications: MCS. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Spot On Solar offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Spot On Solar for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Spot On Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Spot On Solar handle permits and paperwork?

The exact scope is not verified on this profile. Ask Spot On Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

0
Employees1-10
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Spot On Solar

Send your project details to request follow-up from Spot On Solar. Response timing and consultation terms are set by the company.

For Spot On Solar

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
S

Spot On Solar

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.