SPJ Electrical in Reading
10+ yrs
Experience
50 km
Service radius
2-10
Employees
Profile information
About SPJ Electrical
MCS-accredited solar PV and battery storage specialists in Reading — over 10 years of electrical experience
Reading, RG6 1LT
Reading RG6 1LT
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Reported Equipment Brands
Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.
Panels
Inverters
Batteries
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
12yr
Inverter Warranty
5yr
Installation Warranty
Questions to Ask About Installation
Initial Consultation
Ask whether a site assessment is offered, what it covers, and whether it has a fee.
System Design
Request a design showing the proposed equipment, layout, assumptions, and itemized costs.
Permitting & Approval
Confirm who handles permits, inspections, and utility interconnection, and which fees are included.
Installation
Verify the installation team’s licenses, relevant certifications, and insurance.
Commissioning & Handover
Confirm the testing records, monitoring access, warranty registration, and support included in the handover.
Service Areas
Customer Reviews
No reviews yet. Be the first to review SPJ Electrical!
Frequently Asked Questions
How do I get a quote from SPJ Electrical?
You can request a quote through the form on this page or contact SPJ Electrical directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does SPJ Electrical serve?
SPJ Electrical is based in Reading and serves within a 50 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does SPJ Electrical hold?
This profile lists the following reported certifications: MCS, NAPIT, HIES, TrustMark. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does SPJ Electrical offer?
This profile reports 25-year panel coverage and 5-year workmanship coverage. Ask SPJ Electrical for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask SPJ Electrical for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does SPJ Electrical handle permits and paperwork?
The exact scope is not verified on this profile. Ask SPJ Electrical which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Contact Information
Request a QuoteBusiness Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Similar Installers
Request a Quote from SPJ Electrical
Send your project details to request follow-up from SPJ Electrical. Response timing and consultation terms are set by the company.
For SPJ Electrical
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
SPJ Electrical