S

Soly Energy in Bath

Bath·Solar Installation
ResidentialCommercial

8+ yrs

Experience

31000+

Projects

100 km

Service radius

51-200

Employees

Profile information

67%
Contact details0%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About Soly Energy

B Corp certified solar installer with MCS, HIES and TrustMark accreditation serving Bath

Bath, EC1N 2ST

Bath EC1N 2ST

Services Offered

Solar InstallationBattery StorageMaintenance

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

MCSHIESTrustMark

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

BathBristolSwindonCheltenhamLondonOxford

Customer Reviews

No reviews yet. Be the first to review Soly Energy!

Write a Review

Frequently Asked Questions

How do I get a quote from Soly Energy?

You can request a quote through the form on this page or contact Soly Energy directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Soly Energy serve?

Soly Energy is based in Bath and serves within a 100 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Soly Energy hold?

This profile lists the following reported certifications: MCS, HIES, TrustMark. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Soly Energy offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Soly Energy for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Soly Energy for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Soly Energy handle permits and paperwork?

The exact scope is not verified on this profile. Ask Soly Energy which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Request a Quote

Business Details

Founded2018
Employees51-200
Profile StatusUnclaimed
Profile Complete67%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Soly Energy

Send your project details to request follow-up from Soly Energy. Response timing and consultation terms are set by the company.

For Soly Energy

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
S

Soly Energy

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.