Solent Renewables in Portsmouth
4+ yrs
Experience
60 km
Service radius
2-10
Employees
Profile information
About Solent Renewables
MCS certified Hampshire solar installer combining 17 years of electrical experience with a decade of solar expertise
Portsmouth, SO15 7RG
Portsmouth SO15 7RG
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Questions to Ask About Installation
Initial Consultation
Ask whether a site assessment is offered, what it covers, and whether it has a fee.
System Design
Request a design showing the proposed equipment, layout, assumptions, and itemized costs.
Permitting & Approval
Confirm who handles permits, inspections, and utility interconnection, and which fees are included.
Installation
Verify the installation team’s licenses, relevant certifications, and insurance.
Commissioning & Handover
Confirm the testing records, monitoring access, warranty registration, and support included in the handover.
Service Areas
Customer Reviews
No reviews yet. Be the first to review Solent Renewables!
Frequently Asked Questions
How do I get a quote from Solent Renewables?
You can request a quote through the form on this page or contact Solent Renewables directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does Solent Renewables serve?
Solent Renewables is based in Portsmouth and serves within a 60 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does Solent Renewables hold?
This profile lists the following reported certifications: MCS, NAPIT, Checkatrade. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does Solent Renewables offer?
Warranty terms are not documented on this profile. Ask Solent Renewables for the equipment, workmanship, exclusions, transfer, and claim terms in writing.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask Solent Renewables for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does Solent Renewables handle permits and paperwork?
The exact scope is not verified on this profile. Ask Solent Renewables which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Contact Information
Request a QuoteBusiness Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Similar Installers
Request a Quote from Solent Renewables
Send your project details to request follow-up from Solent Renewables. Response timing and consultation terms are set by the company.
For Solent Renewables
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
Solent Renewables