S

Solec Energy Solutions in Leeds

Leeds·Solar Installation
ResidentialCommercial

16+ yrs

Experience

60 km

Service radius

2-10

Employees

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About Solec Energy Solutions

Leeds-based renewable energy contractor with 15 years of solar and electrical expertise

Leeds, LS6 4DB

Leeds LS6 4DB

Services Offered

Solar InstallationBattery StorageEV ChargingMaintenanceEnergy Audit

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

NAPITTrustMarkREAL

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

10yr

Inverter Warranty

5yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

LeedsHarrogateBradfordWakefieldYork

Customer Reviews

No reviews yet. Be the first to review Solec Energy Solutions!

Write a Review

Frequently Asked Questions

How do I get a quote from Solec Energy Solutions?

You can request a quote through the form on this page or contact Solec Energy Solutions directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Solec Energy Solutions serve?

Solec Energy Solutions is based in Leeds and serves within a 60 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Solec Energy Solutions hold?

This profile lists the following reported certifications: NAPIT, TrustMark, REAL. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Solec Energy Solutions offer?

This profile reports 25-year panel coverage and 5-year workmanship coverage. Ask Solec Energy Solutions for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Solec Energy Solutions for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Solec Energy Solutions handle permits and paperwork?

The exact scope is not verified on this profile. Ask Solec Energy Solutions which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded2010
Employees2-10
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Solec Energy Solutions

Send your project details to request follow-up from Solec Energy Solutions. Response timing and consultation terms are set by the company.

For Solec Energy Solutions

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
S

Solec Energy Solutions

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.