SolarTherm UK in Basildon
60 km
Service radius
11-50
Employees
Profile information
About SolarTherm UK
Award-winning MCS, HIES and EPVS certified solar and battery installer based in Basildon with 15+ years experience
Basildon, SS14 3BE
Basildon SS14 3BE
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
12yr
Inverter Warranty
10yr
Installation Warranty
Questions to Ask About Installation
Initial Consultation
Ask whether a site assessment is offered, what it covers, and whether it has a fee.
System Design
Request a design showing the proposed equipment, layout, assumptions, and itemized costs.
Permitting & Approval
Confirm who handles permits, inspections, and utility interconnection, and which fees are included.
Installation
Verify the installation team’s licenses, relevant certifications, and insurance.
Commissioning & Handover
Confirm the testing records, monitoring access, warranty registration, and support included in the handover.
Service Areas
Customer Reviews
No reviews yet. Be the first to review SolarTherm UK!
Frequently Asked Questions
How do I get a quote from SolarTherm UK?
You can request a quote through the form on this page or contact SolarTherm UK directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does SolarTherm UK serve?
SolarTherm UK is based in Basildon and serves within a 60 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does SolarTherm UK hold?
This profile lists the following reported certifications: MCS, HIES, EPVS. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does SolarTherm UK offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask SolarTherm UK for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask SolarTherm UK for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does SolarTherm UK handle permits and paperwork?
The exact scope is not verified on this profile. Ask SolarTherm UK which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Contact Information
Request a QuoteBusiness Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Similar Installers
Request a Quote from SolarTherm UK
Send your project details to request follow-up from SolarTherm UK. Response timing and consultation terms are set by the company.
For SolarTherm UK
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
SolarTherm UK