S

SolarPowerful in Portsmouth

Portsmouth·Solar Installation
ResidentialCommercialIndustrial

16+ yrs

Experience

80 km

Service radius

2-10

Employees

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About SolarPowerful

Hampshire solar specialists since 2010 with hundreds of installations, NICEIC approved and RECC member

Portsmouth, PO8 0BB

Portsmouth PO8 0BB

Services Offered

Solar InstallationBattery StorageEV ChargingMaintenanceMonitoring

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

MCSNICEICRECCNAPIT

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

PortsmouthHampshireWaterloovilleHavantChichesterSouthampton

Customer Reviews

No reviews yet. Be the first to review SolarPowerful!

Write a Review

Frequently Asked Questions

How do I get a quote from SolarPowerful?

You can request a quote through the form on this page or contact SolarPowerful directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does SolarPowerful serve?

SolarPowerful is based in Portsmouth and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does SolarPowerful hold?

This profile lists the following reported certifications: MCS, NICEIC, RECC, NAPIT. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does SolarPowerful offer?

Warranty terms are not documented on this profile. Ask SolarPowerful for the equipment, workmanship, exclusions, transfer, and claim terms in writing.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask SolarPowerful for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does SolarPowerful handle permits and paperwork?

The exact scope is not verified on this profile. Ask SolarPowerful which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded2010
Employees2-10
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from SolarPowerful

Send your project details to request follow-up from SolarPowerful. Response timing and consultation terms are set by the company.

For SolarPowerful

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
S

SolarPowerful

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.