Solar Tops in Coventry
3+ yrs
Experience
60 km
Service radius
2-10
Employees
Profile information
About Solar Tops
Coventry-based provider of solar panels, battery storage, heat pumps and EV charging across the West Midlands
Coventry, CV3 4FJ
Coventry CV3 4FJ
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
10yr
Installation Warranty
Questions to Ask About Installation
Initial Consultation
Ask whether a site assessment is offered, what it covers, and whether it has a fee.
System Design
Request a design showing the proposed equipment, layout, assumptions, and itemized costs.
Permitting & Approval
Confirm who handles permits, inspections, and utility interconnection, and which fees are included.
Installation
Verify the installation team’s licenses, relevant certifications, and insurance.
Commissioning & Handover
Confirm the testing records, monitoring access, warranty registration, and support included in the handover.
Service Areas
Customer Reviews
No reviews yet. Be the first to review Solar Tops!
Frequently Asked Questions
How do I get a quote from Solar Tops?
You can request a quote through the form on this page or contact Solar Tops directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does Solar Tops serve?
Solar Tops is based in Coventry and serves within a 60 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does Solar Tops hold?
This profile lists the following reported certifications: MCS. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does Solar Tops offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Solar Tops for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask Solar Tops for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does Solar Tops handle permits and paperwork?
The exact scope is not verified on this profile. Ask Solar Tops which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Business Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Similar Installers
Request a Quote from Solar Tops
Send your project details to request follow-up from Solar Tops. Response timing and consultation terms are set by the company.
For Solar Tops
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
Solar Tops