Solar Solutions Oxford in Oxford
50 km
Service radius
1-10
Employees
Profile information
About Solar Solutions Oxford
MCS-accredited residential and commercial solar installer based in Abingdon, Oxfordshire
Oxford, OX14 4SB
Oxford OX14 4SB
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
10yr
Inverter Warranty
3yr
Installation Warranty
Questions to Ask About Installation
Initial Consultation
Ask whether a site assessment is offered, what it covers, and whether it has a fee.
System Design
Request a design showing the proposed equipment, layout, assumptions, and itemized costs.
Permitting & Approval
Confirm who handles permits, inspections, and utility interconnection, and which fees are included.
Installation
Verify the installation team’s licenses, relevant certifications, and insurance.
Commissioning & Handover
Confirm the testing records, monitoring access, warranty registration, and support included in the handover.
Service Areas
Customer Reviews
No reviews yet. Be the first to review Solar Solutions Oxford!
Frequently Asked Questions
How do I get a quote from Solar Solutions Oxford?
You can request a quote through the form on this page or contact Solar Solutions Oxford directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does Solar Solutions Oxford serve?
Solar Solutions Oxford is based in Oxford and serves within a 50 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does Solar Solutions Oxford hold?
This profile lists the following reported certifications: MCS. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does Solar Solutions Oxford offer?
This profile reports 25-year panel coverage and 3-year workmanship coverage. Ask Solar Solutions Oxford for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask Solar Solutions Oxford for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does Solar Solutions Oxford handle permits and paperwork?
The exact scope is not verified on this profile. Ask Solar Solutions Oxford which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Business Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Similar Installers
Request a Quote from Solar Solutions Oxford
Send your project details to request follow-up from Solar Solutions Oxford. Response timing and consultation terms are set by the company.
For Solar Solutions Oxford
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
Solar Solutions Oxford