S

Solar Plus Yorkshire in York

York·Solar Installation
ResidentialCommercial

16+ yrs

Experience

60 km

Service radius

1-10

Employees

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About Solar Plus Yorkshire

Independent Yorkshire solar specialist founded by an electronics engineer with 27 years of experience

York, YO51 9HL

York YO51 9HL

Services Offered

Solar InstallationBattery StorageEV ChargingMaintenance

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

MCS

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

SolarWorld

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

YorkBoroughbridgeKnaresboroughHarrogateRiponWetherby

Customer Reviews

No reviews yet. Be the first to review Solar Plus Yorkshire!

Write a Review

Frequently Asked Questions

How do I get a quote from Solar Plus Yorkshire?

You can request a quote through the form on this page or contact Solar Plus Yorkshire directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Solar Plus Yorkshire serve?

Solar Plus Yorkshire is based in York and serves within a 60 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Solar Plus Yorkshire hold?

This profile lists the following reported certifications: MCS. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Solar Plus Yorkshire offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Solar Plus Yorkshire for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Solar Plus Yorkshire for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Solar Plus Yorkshire handle permits and paperwork?

The exact scope is not verified on this profile. Ask Solar Plus Yorkshire which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded2010
Employees1-10
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Solar Plus Yorkshire

Send your project details to request follow-up from Solar Plus Yorkshire. Response timing and consultation terms are set by the company.

For Solar Plus Yorkshire

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
S

Solar Plus Yorkshire

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.