S

Sola UK in London

London·Solar Installation
Residential
0

40 km

Service radius

1-10

Employees

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About Sola UK

MCS and TrustMark certified solar and EV charging specialists in North London

London, AL3 4PQ

London AL3 4PQ

Services Offered

Solar InstallationBattery StorageEV Charging

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

MCSTrustMark

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

LondonBarnetEnfieldHaringeyCamdenIslingtonHackneyWaltham ForestSt Albans

Customer Reviews

No reviews yet. Be the first to review Sola UK!

Write a Review

Frequently Asked Questions

How do I get a quote from Sola UK?

You can request a quote through the form on this page or contact Sola UK directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Sola UK serve?

Sola UK is based in London and serves within a 40 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Sola UK hold?

This profile lists the following reported certifications: MCS, TrustMark. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Sola UK offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Sola UK for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Sola UK for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Sola UK handle permits and paperwork?

The exact scope is not verified on this profile. Ask Sola UK which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Request a Quote

Business Details

0
Employees1-10
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Sola UK

Send your project details to request follow-up from Sola UK. Response timing and consultation terms are set by the company.

For Sola UK

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.