S

SGS Heating and Electrical in Salisbury

Salisbury·Solar Installation
ResidentialCommercial
0

50 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About SGS Heating and Electrical

Salisbury's award-winning MCS-accredited solar and renewable energy specialist with almost 40 years serving Wiltshire

Salisbury, SP1 2NB

Salisbury SP1 2NB

Services Offered

Solar InstallationBattery StorageEV ChargingMaintenance

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

MCSWHICH? Trusted Trader

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

SalisburyAndoverAmesburyFordingbridgeRomseyBlandford Forum

Customer Reviews

No reviews yet. Be the first to review SGS Heating and Electrical!

Write a Review

Frequently Asked Questions

How do I get a quote from SGS Heating and Electrical?

You can request a quote through the form on this page or contact SGS Heating and Electrical directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does SGS Heating and Electrical serve?

SGS Heating and Electrical is based in Salisbury and serves within a 50 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does SGS Heating and Electrical hold?

This profile lists the following reported certifications: MCS, WHICH? Trusted Trader. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does SGS Heating and Electrical offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask SGS Heating and Electrical for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask SGS Heating and Electrical for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does SGS Heating and Electrical handle permits and paperwork?

The exact scope is not verified on this profile. Ask SGS Heating and Electrical which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

0
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from SGS Heating and Electrical

Send your project details to request follow-up from SGS Heating and Electrical. Response timing and consultation terms are set by the company.

For SGS Heating and Electrical

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
S

SGS Heating and Electrical

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.