SCJ Electrical & Renewables in Newcastle
8+ yrs
Experience
80 km
Service radius
Profile information
About SCJ Electrical & Renewables
Award-winning solar PV and battery storage specialist in Cramlington, Northumberland
Newcastle, NE23 1WF
Newcastle NE23 1WF
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
10yr
Installation Warranty
Questions to Ask About Installation
Initial Consultation
Ask whether a site assessment is offered, what it covers, and whether it has a fee.
System Design
Request a design showing the proposed equipment, layout, assumptions, and itemized costs.
Permitting & Approval
Confirm who handles permits, inspections, and utility interconnection, and which fees are included.
Installation
Verify the installation team’s licenses, relevant certifications, and insurance.
Commissioning & Handover
Confirm the testing records, monitoring access, warranty registration, and support included in the handover.
Service Areas
Customer Reviews
No reviews yet. Be the first to review SCJ Electrical & Renewables!
Frequently Asked Questions
How do I get a quote from SCJ Electrical & Renewables?
You can request a quote through the form on this page or contact SCJ Electrical & Renewables directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does SCJ Electrical & Renewables serve?
SCJ Electrical & Renewables is based in Newcastle and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does SCJ Electrical & Renewables hold?
This profile lists the following reported certifications: MCS, CHAS, ISO 9001. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does SCJ Electrical & Renewables offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask SCJ Electrical & Renewables for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask SCJ Electrical & Renewables for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does SCJ Electrical & Renewables handle permits and paperwork?
The exact scope is not verified on this profile. Ask SCJ Electrical & Renewables which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Contact Information
Request a QuoteBusiness Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Similar Installers
Request a Quote from SCJ Electrical & Renewables
Send your project details to request follow-up from SCJ Electrical & Renewables. Response timing and consultation terms are set by the company.
For SCJ Electrical & Renewables
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
SCJ Electrical & Renewables