S

Save Energy UK in Southampton

Southampton·Solar Installation
ResidentialCommercial

21+ yrs

Experience

80 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Save Energy UK

Family-owned MCS and NAPIT-certified solar installer with 20 years experience serving Southampton and the South Coast

Southampton, BH12 4FB

Southampton BH12 4FB

Services Offered

Solar InstallationBattery StorageMaintenanceEnergy Audit

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

MCSNAPITRECCCHAS

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

SouthamptonPortsmouthBournemouthPooleChristchurch

Customer Reviews

No reviews yet. Be the first to review Save Energy UK!

Write a Review

Frequently Asked Questions

How do I get a quote from Save Energy UK?

You can request a quote through the form on this page or contact Save Energy UK directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Save Energy UK serve?

Save Energy UK is based in Southampton and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Save Energy UK hold?

This profile lists the following reported certifications: MCS, NAPIT, RECC, CHAS. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Save Energy UK offer?

Warranty terms are not documented on this profile. Ask Save Energy UK for the equipment, workmanship, exclusions, transfer, and claim terms in writing.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Save Energy UK for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Save Energy UK handle permits and paperwork?

The exact scope is not verified on this profile. Ask Save Energy UK which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2005
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Save Energy UK

Send your project details to request follow-up from Save Energy UK. Response timing and consultation terms are set by the company.

For Save Energy UK

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
S

Save Energy UK

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.