Rollings Renewables in Cheltenham
24+ yrs
Experience
60 km
Service radius
11-50
Employees
Profile information
About Rollings Renewables
20+ years of renewable energy expertise — MCS and RECC accredited, serving Cheltenham and Gloucestershire
Cheltenham, B63 3TT
Cheltenham B63 3TT
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Reported Equipment Brands
Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.
Batteries
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
12yr
Inverter Warranty
10yr
Installation Warranty
Questions to Ask About Installation
Initial Consultation
Ask whether a site assessment is offered, what it covers, and whether it has a fee.
System Design
Request a design showing the proposed equipment, layout, assumptions, and itemized costs.
Permitting & Approval
Confirm who handles permits, inspections, and utility interconnection, and which fees are included.
Installation
Verify the installation team’s licenses, relevant certifications, and insurance.
Commissioning & Handover
Confirm the testing records, monitoring access, warranty registration, and support included in the handover.
Service Areas
Customer Reviews
No reviews yet. Be the first to review Rollings Renewables!
Frequently Asked Questions
How do I get a quote from Rollings Renewables?
You can request a quote through the form on this page or contact Rollings Renewables directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does Rollings Renewables serve?
Rollings Renewables is based in Cheltenham and serves within a 60 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does Rollings Renewables hold?
This profile lists the following reported certifications: MCS, RECC. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does Rollings Renewables offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Rollings Renewables for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask Rollings Renewables for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does Rollings Renewables handle permits and paperwork?
The exact scope is not verified on this profile. Ask Rollings Renewables which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Contact Information
Request a QuoteBusiness Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Similar Installers
Request a Quote from Rollings Renewables
Send your project details to request follow-up from Rollings Renewables. Response timing and consultation terms are set by the company.
For Rollings Renewables
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
Rollings Renewables