R

ReVision Energy in Worcester

Worcester, Massachusetts·Solar Installation
ResidentialCommercial

23+ yrs

Experience

120 km

Service radius

201-500

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About ReVision Energy

Employee-owned solar company with 20+ years of experience installing residential and commercial solar across New England

Worcester, Massachusetts 01845

Worcester, Massachusetts 01845

Services Offered

Solar InstallationBattery StorageEV ChargingSolar DesignMaintenanceMonitoring

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

NABCEPB Corp Certified

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Inverters

EnphaseSolarEdge

Batteries

Tesla PowerwallEnphase

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Worcester, MassachusettsNorth Andover, MassachusettsBoston, MassachusettsLowell, MassachusettsFitchburg, MassachusettsLeominster, Massachusetts

Customer Reviews

No reviews yet. Be the first to review ReVision Energy!

Write a Review

Frequently Asked Questions

How do I get a quote from ReVision Energy?

You can request a quote through the form on this page or contact ReVision Energy directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does ReVision Energy serve?

ReVision Energy is based in Worcester and serves within a 120 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does ReVision Energy hold?

This profile lists the following reported certifications: NABCEP, B Corp Certified. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does ReVision Energy offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask ReVision Energy for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask ReVision Energy for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does ReVision Energy handle permits and paperwork?

The exact scope is not verified on this profile. Ask ReVision Energy which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2003
Employees201-500
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from ReVision Energy

Send your project details to request follow-up from ReVision Energy. Response timing and consultation terms are set by the company.

For ReVision Energy

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
R

ReVision Energy

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.