Refresh NI in Belfast
60 km
Service radius
11-50
Employees
Profile information
About Refresh NI
Belfast's one-stop-shop for solar, battery storage, EV charging, and home efficiency
Belfast,
Belfast
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
12yr
Inverter Warranty
10yr
Installation Warranty
Questions to Ask About Installation
Initial Consultation
Ask whether a site assessment is offered, what it covers, and whether it has a fee.
System Design
Request a design showing the proposed equipment, layout, assumptions, and itemized costs.
Permitting & Approval
Confirm who handles permits, inspections, and utility interconnection, and which fees are included.
Installation
Verify the installation team’s licenses, relevant certifications, and insurance.
Commissioning & Handover
Confirm the testing records, monitoring access, warranty registration, and support included in the handover.
Service Areas
Customer Reviews
No reviews yet. Be the first to review Refresh NI!
Frequently Asked Questions
How do I get a quote from Refresh NI?
You can request a quote through the form on this page or contact Refresh NI directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does Refresh NI serve?
Refresh NI is based in Belfast and serves within a 60 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does Refresh NI hold?
This profile lists the following reported certifications: MCS. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does Refresh NI offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Refresh NI for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask Refresh NI for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does Refresh NI handle permits and paperwork?
The exact scope is not verified on this profile. Ask Refresh NI which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Business Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Similar Installers
Request a Quote from Refresh NI
Send your project details to request follow-up from Refresh NI. Response timing and consultation terms are set by the company.
For Refresh NI
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
Refresh NI