Project Solar UK in Derby
15+ yrs
Experience
45000+
Projects
100 km
Service radius
201-500
Employees
Profile information
About Project Solar UK
Published directory profile for Project Solar UK in Derby. Verify services, credentials, ratings, and references directly with their original sources.
Derby, DE13
Derby DE13
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Reported Equipment Brands
Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.
Panels
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
12yr
Inverter Warranty
10yr
Installation Warranty
Questions to Ask About Installation
Initial Consultation
Ask whether a site assessment is offered, what it covers, and whether it has a fee.
System Design
Request a design showing the proposed equipment, layout, assumptions, and itemized costs.
Permitting & Approval
Confirm who handles permits, inspections, and utility interconnection, and which fees are included.
Installation
Verify the installation team’s licenses, relevant certifications, and insurance.
Commissioning & Handover
Confirm the testing records, monitoring access, warranty registration, and support included in the handover.
Service Areas
Customer Reviews
No reviews yet. Be the first to review Project Solar UK!
Frequently Asked Questions
How do I get a quote from Project Solar UK?
You can request a quote through the form on this page or contact Project Solar UK directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does Project Solar UK serve?
Project Solar UK is based in Derby and serves within a 100 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does Project Solar UK hold?
This profile lists the following reported certifications: MCS. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does Project Solar UK offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Project Solar UK for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask Project Solar UK for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does Project Solar UK handle permits and paperwork?
The exact scope is not verified on this profile. Ask Project Solar UK which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Business Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Similar Installers
Request a Quote from Project Solar UK
Send your project details to request follow-up from Project Solar UK. Response timing and consultation terms are set by the company.
For Project Solar UK
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
Project Solar UK