P

Premier Renewables Wiltshire in Swindon

Swindon·Solar Installation
ResidentialCommercial

4+ yrs

Experience

50 km

Service radius

1-10

Employees

Profile information

67%
Contact details0%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About Premier Renewables Wiltshire

NAPIT-accredited solar, EV charger, and electrical specialists based in Swindon with 16 years of electrical sector experience

Swindon, SN2 1HB

Swindon SN2 1HB

Services Offered

Solar InstallationBattery StorageEV Charging

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

MCSNAPITRECC

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

SwindonRoyal Wootton BassettCirencesterOxfordBathChippenham

Customer Reviews

No reviews yet. Be the first to review Premier Renewables Wiltshire!

Write a Review

Frequently Asked Questions

How do I get a quote from Premier Renewables Wiltshire?

You can request a quote through the form on this page or contact Premier Renewables Wiltshire directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Premier Renewables Wiltshire serve?

Premier Renewables Wiltshire is based in Swindon and serves within a 50 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Premier Renewables Wiltshire hold?

This profile lists the following reported certifications: MCS, NAPIT, RECC. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Premier Renewables Wiltshire offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Premier Renewables Wiltshire for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Premier Renewables Wiltshire for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Premier Renewables Wiltshire handle permits and paperwork?

The exact scope is not verified on this profile. Ask Premier Renewables Wiltshire which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Request a Quote

Business Details

Founded2022
Employees1-10
Profile StatusUnclaimed
Profile Complete67%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Premier Renewables Wiltshire

Send your project details to request follow-up from Premier Renewables Wiltshire. Response timing and consultation terms are set by the company.

For Premier Renewables Wiltshire

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
P

Premier Renewables Wiltshire

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.