Orange Solar Systems in Southampton
16+ yrs
Experience
80 km
Service radius
2-10
Employees
Profile information
About Orange Solar Systems
Family-run MCS-certified solar PV installer serving Southampton and Hampshire for over 15 years
Southampton, SO19 7BS
Southampton SO19 7BS
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Questions to Ask About Installation
Initial Consultation
Ask whether a site assessment is offered, what it covers, and whether it has a fee.
System Design
Request a design showing the proposed equipment, layout, assumptions, and itemized costs.
Permitting & Approval
Confirm who handles permits, inspections, and utility interconnection, and which fees are included.
Installation
Verify the installation team’s licenses, relevant certifications, and insurance.
Commissioning & Handover
Confirm the testing records, monitoring access, warranty registration, and support included in the handover.
Service Areas
Customer Reviews
No reviews yet. Be the first to review Orange Solar Systems!
Frequently Asked Questions
How do I get a quote from Orange Solar Systems?
You can request a quote through the form on this page or contact Orange Solar Systems directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does Orange Solar Systems serve?
Orange Solar Systems is based in Southampton and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does Orange Solar Systems hold?
This profile lists the following reported certifications: MCS, NAPIT. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does Orange Solar Systems offer?
Warranty terms are not documented on this profile. Ask Orange Solar Systems for the equipment, workmanship, exclusions, transfer, and claim terms in writing.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask Orange Solar Systems for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does Orange Solar Systems handle permits and paperwork?
The exact scope is not verified on this profile. Ask Orange Solar Systems which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Contact Information
Request a QuoteBusiness Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Similar Installers
Request a Quote from Orange Solar Systems
Send your project details to request follow-up from Orange Solar Systems. Response timing and consultation terms are set by the company.
For Orange Solar Systems
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
Orange Solar Systems