O

Octopus Energy Services in London

London·Solar Installation
Residential

10+ yrs

Experience

500 km

Service radius

200+

Employees

Profile information

67%
Contact details0%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About Octopus Energy Services

Large-scale MCS certified solar, battery and EV charging installations across the UK

London, W1D 1NN

London W1D 1NN

Services Offered

Solar InstallationBattery StorageEV ChargingMonitoring

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

MCSRECCTrustMarkNAPIT

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

JA Solar

Inverters

Enphase

Batteries

Tesla PowerwallEnphase

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

LondonManchesterBirminghamBristolLeedsSheffieldEdinburghGlasgowCardiffSouthampton

Customer Reviews

No reviews yet. Be the first to review Octopus Energy Services!

Write a Review

Frequently Asked Questions

How do I get a quote from Octopus Energy Services?

You can request a quote through the form on this page or contact Octopus Energy Services directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Octopus Energy Services serve?

Octopus Energy Services is based in London and serves within a 500 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Octopus Energy Services hold?

This profile lists the following reported certifications: MCS, RECC, TrustMark, NAPIT. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Octopus Energy Services offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Octopus Energy Services for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Octopus Energy Services for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Octopus Energy Services handle permits and paperwork?

The exact scope is not verified on this profile. Ask Octopus Energy Services which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded2016
Employees200+
Profile StatusUnclaimed
Profile Complete67%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Octopus Energy Services

Send your project details to request follow-up from Octopus Energy Services. Response timing and consultation terms are set by the company.

For Octopus Energy Services

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
O

Octopus Energy Services

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.