N

New England Clean Energy in Worcester

Worcester, Massachusetts·Solar Installation
ResidentialCommercial

15+ yrs

Experience

100 km

Service radius

51-200

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About New England Clean Energy

Employee-owned solar installer serving Massachusetts since 2011 with residential and commercial installations

Worcester, Massachusetts 01749

Worcester, Massachusetts 01749

Services Offered

Solar InstallationBattery StorageSolar DesignMonitoringMaintenance

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

NABCEPMassCEC Approved

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

RECSilfab

Inverters

EnphaseSolarEdge

Batteries

Tesla PowerwallEnphase

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Worcester, MassachusettsHudson, MassachusettsFramingham, MassachusettsLeominster, MassachusettsFitchburg, MassachusettsMarlborough, Massachusetts

Customer Reviews

No reviews yet. Be the first to review New England Clean Energy!

Write a Review

Frequently Asked Questions

How do I get a quote from New England Clean Energy?

You can request a quote through the form on this page or contact New England Clean Energy directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does New England Clean Energy serve?

New England Clean Energy is based in Worcester and serves within a 100 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does New England Clean Energy hold?

This profile lists the following reported certifications: NABCEP, MassCEC Approved. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does New England Clean Energy offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask New England Clean Energy for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask New England Clean Energy for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does New England Clean Energy handle permits and paperwork?

The exact scope is not verified on this profile. Ask New England Clean Energy which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2011
Employees51-200
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from New England Clean Energy

Send your project details to request follow-up from New England Clean Energy. Response timing and consultation terms are set by the company.

For New England Clean Energy

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
N

New England Clean Energy

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.