Naked Solar Exeter in Exeter
16+ yrs
Experience
80 km
Service radius
51-200
Employees
Profile information
About Naked Solar Exeter
Award-winning South West solar installer with Exeter hub — B Corp, Tesla Premium Certified since 2010
Exeter, EX2 7LD
Exeter EX2 7LD
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Reported Equipment Brands
Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.
Panels
Inverters
Batteries
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
12yr
Inverter Warranty
10yr
Installation Warranty
Questions to Ask About Installation
Initial Consultation
Ask whether a site assessment is offered, what it covers, and whether it has a fee.
System Design
Request a design showing the proposed equipment, layout, assumptions, and itemized costs.
Permitting & Approval
Confirm who handles permits, inspections, and utility interconnection, and which fees are included.
Installation
Verify the installation team’s licenses, relevant certifications, and insurance.
Commissioning & Handover
Confirm the testing records, monitoring access, warranty registration, and support included in the handover.
Service Areas
Customer Reviews
No reviews yet. Be the first to review Naked Solar Exeter!
Frequently Asked Questions
How do I get a quote from Naked Solar Exeter?
You can request a quote through the form on this page or contact Naked Solar Exeter directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does Naked Solar Exeter serve?
Naked Solar Exeter is based in Exeter and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does Naked Solar Exeter hold?
This profile lists the following reported certifications: MCS, RECC, NICEIC, B Corp. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does Naked Solar Exeter offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Naked Solar Exeter for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask Naked Solar Exeter for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does Naked Solar Exeter handle permits and paperwork?
The exact scope is not verified on this profile. Ask Naked Solar Exeter which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Business Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Similar Installers
Request a Quote from Naked Solar Exeter
Send your project details to request follow-up from Naked Solar Exeter. Response timing and consultation terms are set by the company.
For Naked Solar Exeter
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
Naked Solar Exeter