MJ Renewables in Luton
17+ yrs
Experience
60 km
Service radius
2-10
Employees
Profile information
About MJ Renewables
MCS, NAPIT and Tesla-certified solar and EV specialists serving Luton and Bedfordshire since 2009
Luton, MK43 0FL
Luton MK43 0FL
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Reported Equipment Brands
Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.
Batteries
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
12yr
Inverter Warranty
10yr
Installation Warranty
Questions to Ask About Installation
Initial Consultation
Ask whether a site assessment is offered, what it covers, and whether it has a fee.
System Design
Request a design showing the proposed equipment, layout, assumptions, and itemized costs.
Permitting & Approval
Confirm who handles permits, inspections, and utility interconnection, and which fees are included.
Installation
Verify the installation team’s licenses, relevant certifications, and insurance.
Commissioning & Handover
Confirm the testing records, monitoring access, warranty registration, and support included in the handover.
Service Areas
Customer Reviews
No reviews yet. Be the first to review MJ Renewables!
Frequently Asked Questions
How do I get a quote from MJ Renewables?
You can request a quote through the form on this page or contact MJ Renewables directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does MJ Renewables serve?
MJ Renewables is based in Luton and serves within a 60 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does MJ Renewables hold?
This profile lists the following reported certifications: MCS, NAPIT, RECC, TrustMark. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does MJ Renewables offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask MJ Renewables for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask MJ Renewables for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does MJ Renewables handle permits and paperwork?
The exact scope is not verified on this profile. Ask MJ Renewables which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Business Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Similar Installers
Request a Quote from MJ Renewables
Send your project details to request follow-up from MJ Renewables. Response timing and consultation terms are set by the company.
For MJ Renewables
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
MJ Renewables