Logan Installations in Glasgow
10+ yrs
Experience
500+
Projects
60 km
Service radius
2-10
Employees
Profile information
About Logan Installations
NICEIC and MCS-accredited solar installers based in Glasgow since 2016
Glasgow, G72 8XP
Glasgow G72 8XP
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
10yr
Inverter Warranty
5yr
Installation Warranty
Questions to Ask About Installation
Initial Consultation
Ask whether a site assessment is offered, what it covers, and whether it has a fee.
System Design
Request a design showing the proposed equipment, layout, assumptions, and itemized costs.
Permitting & Approval
Confirm who handles permits, inspections, and utility interconnection, and which fees are included.
Installation
Verify the installation team’s licenses, relevant certifications, and insurance.
Commissioning & Handover
Confirm the testing records, monitoring access, warranty registration, and support included in the handover.
Service Areas
Customer Reviews
No reviews yet. Be the first to review Logan Installations!
Frequently Asked Questions
How do I get a quote from Logan Installations?
You can request a quote through the form on this page or contact Logan Installations directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does Logan Installations serve?
Logan Installations is based in Glasgow and serves within a 60 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does Logan Installations hold?
This profile lists the following reported certifications: MCS, NICEIC, RECC. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does Logan Installations offer?
This profile reports 25-year panel coverage and 5-year workmanship coverage. Ask Logan Installations for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask Logan Installations for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does Logan Installations handle permits and paperwork?
The exact scope is not verified on this profile. Ask Logan Installations which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Contact Information
Request a QuoteBusiness Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Similar Installers
Request a Quote from Logan Installations
Send your project details to request follow-up from Logan Installations. Response timing and consultation terms are set by the company.
For Logan Installations
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
Logan Installations