JPS Renewable Energy in Maidstone
16+ yrs
Experience
80 km
Service radius
11-50
Employees
Profile information
About JPS Renewable Energy
Kent's solar panel, Tesla Powerwall and EV charger specialists operating from Maidstone since 2010
Maidstone, ME15 9YT
Maidstone ME15 9YT
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Reported Equipment Brands
Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.
Batteries
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
25yr
Inverter Warranty
5yr
Installation Warranty
Questions to Ask About Installation
Initial Consultation
Ask whether a site assessment is offered, what it covers, and whether it has a fee.
System Design
Request a design showing the proposed equipment, layout, assumptions, and itemized costs.
Permitting & Approval
Confirm who handles permits, inspections, and utility interconnection, and which fees are included.
Installation
Verify the installation team’s licenses, relevant certifications, and insurance.
Commissioning & Handover
Confirm the testing records, monitoring access, warranty registration, and support included in the handover.
Service Areas
Customer Reviews
No reviews yet. Be the first to review JPS Renewable Energy!
Frequently Asked Questions
How do I get a quote from JPS Renewable Energy?
You can request a quote through the form on this page or contact JPS Renewable Energy directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does JPS Renewable Energy serve?
JPS Renewable Energy is based in Maidstone and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does JPS Renewable Energy hold?
This profile lists the following reported certifications: MCS, Which? Trusted Trader. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does JPS Renewable Energy offer?
This profile reports 25-year panel coverage and 5-year workmanship coverage. Ask JPS Renewable Energy for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask JPS Renewable Energy for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does JPS Renewable Energy handle permits and paperwork?
The exact scope is not verified on this profile. Ask JPS Renewable Energy which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Business Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Similar Installers
Request a Quote from JPS Renewable Energy
Send your project details to request follow-up from JPS Renewable Energy. Response timing and consultation terms are set by the company.
For JPS Renewable Energy
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
JPS Renewable Energy