J

Joju Solar Oxford in Oxford

Oxford·Solar Installation
ResidentialCommercial

20+ yrs

Experience

80 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Joju Solar Oxford

Award-winning solar and renewables specialists with an Oxford office since 2006

Oxford, OX4 1JE

Oxford OX4 1JE

Services Offered

Solar InstallationBattery StorageEV ChargingMaintenanceMonitoring

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

MCSRECCNICEIC

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

AikoCanadian SolarHanwha Q Cells

Inverters

SolarEdgeFroniusSMAGivEnergy

Batteries

Tesla Powerwall

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

OxfordAbingdonWitneyBanburyLondonSheffield

Customer Reviews

No reviews yet. Be the first to review Joju Solar Oxford!

Write a Review

Frequently Asked Questions

How do I get a quote from Joju Solar Oxford?

You can request a quote through the form on this page or contact Joju Solar Oxford directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Joju Solar Oxford serve?

Joju Solar Oxford is based in Oxford and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Joju Solar Oxford hold?

This profile lists the following reported certifications: MCS, RECC, NICEIC. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Joju Solar Oxford offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Joju Solar Oxford for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Joju Solar Oxford for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Joju Solar Oxford handle permits and paperwork?

The exact scope is not verified on this profile. Ask Joju Solar Oxford which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2006
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Joju Solar Oxford

Send your project details to request follow-up from Joju Solar Oxford. Response timing and consultation terms are set by the company.

For Joju Solar Oxford

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
J

Joju Solar Oxford

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.