J

JCE Contracting in Bath

Bath·Solar Installation
ResidentialCommercial

27+ yrs

Experience

40 km

Service radius

1-10

Employees

Profile information

67%
Contact details0%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About JCE Contracting

Bath-based NICEIC electrical contractor installing solar, battery and EV systems since 1999

Bath, BA2 2EL

Bath BA2 2EL

Services Offered

Solar InstallationBattery StorageEV Charging

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

MCSNICEIC

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

BathFromeTrowbridgeWarminsterBristolRadstock

Customer Reviews

No reviews yet. Be the first to review JCE Contracting!

Write a Review

Frequently Asked Questions

How do I get a quote from JCE Contracting?

You can request a quote through the form on this page or contact JCE Contracting directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does JCE Contracting serve?

JCE Contracting is based in Bath and serves within a 40 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does JCE Contracting hold?

This profile lists the following reported certifications: MCS, NICEIC. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does JCE Contracting offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask JCE Contracting for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask JCE Contracting for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does JCE Contracting handle permits and paperwork?

The exact scope is not verified on this profile. Ask JCE Contracting which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded1999
Employees1-10
Profile StatusUnclaimed
Profile Complete67%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from JCE Contracting

Send your project details to request follow-up from JCE Contracting. Response timing and consultation terms are set by the company.

For JCE Contracting

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
J

JCE Contracting

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.