JAL Roofing & Solar in Derby
40 km
Service radius
11-50
Employees
Profile information
About JAL Roofing & Solar
Hilton-based roofing and solar PV contractor with 40+ years of experience, MCS accredited for solar installations across Derby
Derby, DE65 5UA
Derby DE65 5UA
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
12yr
Inverter Warranty
10yr
Installation Warranty
Questions to Ask About Installation
Initial Consultation
Ask whether a site assessment is offered, what it covers, and whether it has a fee.
System Design
Request a design showing the proposed equipment, layout, assumptions, and itemized costs.
Permitting & Approval
Confirm who handles permits, inspections, and utility interconnection, and which fees are included.
Installation
Verify the installation team’s licenses, relevant certifications, and insurance.
Commissioning & Handover
Confirm the testing records, monitoring access, warranty registration, and support included in the handover.
Service Areas
Customer Reviews
No reviews yet. Be the first to review JAL Roofing & Solar!
Frequently Asked Questions
How do I get a quote from JAL Roofing & Solar?
You can request a quote through the form on this page or contact JAL Roofing & Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does JAL Roofing & Solar serve?
JAL Roofing & Solar is based in Derby and serves within a 40 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does JAL Roofing & Solar hold?
This profile lists the following reported certifications: MCS, TrustMark. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does JAL Roofing & Solar offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask JAL Roofing & Solar for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask JAL Roofing & Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does JAL Roofing & Solar handle permits and paperwork?
The exact scope is not verified on this profile. Ask JAL Roofing & Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Contact Information
Request a QuoteBusiness Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Similar Installers
Request a Quote from JAL Roofing & Solar
Send your project details to request follow-up from JAL Roofing & Solar. Response timing and consultation terms are set by the company.
For JAL Roofing & Solar
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
JAL Roofing & Solar