I

Ideal Electrical Solutions in Edinburgh

Edinburgh·Solar Installation
ResidentialCommercial

13+ yrs

Experience

60 km

Service radius

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About Ideal Electrical Solutions

Multi-award-winning MCS and NAPIT-accredited solar installer in Edinburgh with prestigious clients including Edinburgh Castle

Edinburgh, EH8 7AN

Edinburgh EH8 7AN

Services Offered

Solar InstallationBattery StorageEV Charging

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

MCSNAPITRECCTrustMarkSELECT

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

EdinburghEast LothianMidlothianWest LothianFife

Customer Reviews

No reviews yet. Be the first to review Ideal Electrical Solutions!

Write a Review

Frequently Asked Questions

How do I get a quote from Ideal Electrical Solutions?

You can request a quote through the form on this page or contact Ideal Electrical Solutions directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Ideal Electrical Solutions serve?

Ideal Electrical Solutions is based in Edinburgh and serves within a 60 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Ideal Electrical Solutions hold?

This profile lists the following reported certifications: MCS, NAPIT, RECC, TrustMark, SELECT. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Ideal Electrical Solutions offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Ideal Electrical Solutions for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Ideal Electrical Solutions for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Ideal Electrical Solutions handle permits and paperwork?

The exact scope is not verified on this profile. Ask Ideal Electrical Solutions which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded2013
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Ideal Electrical Solutions

Send your project details to request follow-up from Ideal Electrical Solutions. Response timing and consultation terms are set by the company.

For Ideal Electrical Solutions

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
I

Ideal Electrical Solutions

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.