H

House Rescue Electrical in London

London·Solar Installation
ResidentialCommercial

6+ yrs

Experience

50 km

Service radius

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About House Rescue Electrical

Published directory profile for House Rescue Electrical in London. Verify services, credentials, ratings, and references directly with their original sources.

London, N7 6DY

London N7 6DY

Services Offered

Solar InstallationBattery StorageEV Charging

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

MCSRECCNICEIC

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

LondonIslington

Customer Reviews

No reviews yet. Be the first to review House Rescue Electrical!

Write a Review

Frequently Asked Questions

How do I get a quote from House Rescue Electrical?

You can request a quote through the form on this page or contact House Rescue Electrical directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does House Rescue Electrical serve?

House Rescue Electrical is based in London and serves within a 50 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does House Rescue Electrical hold?

This profile lists the following reported certifications: MCS, RECC, NICEIC. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does House Rescue Electrical offer?

Warranty terms are not documented on this profile. Ask House Rescue Electrical for the equipment, workmanship, exclusions, transfer, and claim terms in writing.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask House Rescue Electrical for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does House Rescue Electrical handle permits and paperwork?

The exact scope is not verified on this profile. Ask House Rescue Electrical which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2020
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from House Rescue Electrical

Send your project details to request follow-up from House Rescue Electrical. Response timing and consultation terms are set by the company.

For House Rescue Electrical

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
H

House Rescue Electrical

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.