Green Energy Solutions in Plymouth
13+ yrs
Experience
100 km
Service radius
11-50
Employees
Profile information
About Green Energy Solutions
Independent solar PV installers with offices in Plymouth, Exeter and Truro serving Devon, Cornwall and the South West since 2013
Plymouth, PL5 3LZ
Plymouth PL5 3LZ
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Reported Equipment Brands
Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.
Panels
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
10yr
Inverter Warranty
5yr
Installation Warranty
Questions to Ask About Installation
Initial Consultation
Ask whether a site assessment is offered, what it covers, and whether it has a fee.
System Design
Request a design showing the proposed equipment, layout, assumptions, and itemized costs.
Permitting & Approval
Confirm who handles permits, inspections, and utility interconnection, and which fees are included.
Installation
Verify the installation team’s licenses, relevant certifications, and insurance.
Commissioning & Handover
Confirm the testing records, monitoring access, warranty registration, and support included in the handover.
Service Areas
Customer Reviews
No reviews yet. Be the first to review Green Energy Solutions!
Frequently Asked Questions
How do I get a quote from Green Energy Solutions?
You can request a quote through the form on this page or contact Green Energy Solutions directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does Green Energy Solutions serve?
Green Energy Solutions is based in Plymouth and serves within a 100 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does Green Energy Solutions hold?
This profile lists the following reported certifications: MCS, RECC. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does Green Energy Solutions offer?
This profile reports 25-year panel coverage and 5-year workmanship coverage. Ask Green Energy Solutions for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask Green Energy Solutions for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does Green Energy Solutions handle permits and paperwork?
The exact scope is not verified on this profile. Ask Green Energy Solutions which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Business Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Similar Installers
Request a Quote from Green Energy Solutions
Send your project details to request follow-up from Green Energy Solutions. Response timing and consultation terms are set by the company.
For Green Energy Solutions
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
Green Energy Solutions