Green Earth Sussex in Brighton
5+ yrs
Experience
50 km
Service radius
2-10
Employees
Profile information
About Green Earth Sussex
MCS-certified electricians and solar PV installers based in Hove, serving Brighton and East Sussex
Brighton, BN3 8AG
Brighton BN3 8AG
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Questions to Ask About Installation
Initial Consultation
Ask whether a site assessment is offered, what it covers, and whether it has a fee.
System Design
Request a design showing the proposed equipment, layout, assumptions, and itemized costs.
Permitting & Approval
Confirm who handles permits, inspections, and utility interconnection, and which fees are included.
Installation
Verify the installation team’s licenses, relevant certifications, and insurance.
Commissioning & Handover
Confirm the testing records, monitoring access, warranty registration, and support included in the handover.
Service Areas
Customer Reviews
No reviews yet. Be the first to review Green Earth Sussex!
Frequently Asked Questions
How do I get a quote from Green Earth Sussex?
You can request a quote through the form on this page or contact Green Earth Sussex directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does Green Earth Sussex serve?
Green Earth Sussex is based in Brighton and serves within a 50 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does Green Earth Sussex hold?
This profile lists the following reported certifications: MCS, Checkatrade, NAPIT. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does Green Earth Sussex offer?
Warranty terms are not documented on this profile. Ask Green Earth Sussex for the equipment, workmanship, exclusions, transfer, and claim terms in writing.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask Green Earth Sussex for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does Green Earth Sussex handle permits and paperwork?
The exact scope is not verified on this profile. Ask Green Earth Sussex which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Contact Information
Request a QuoteBusiness Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Similar Installers
Request a Quote from Green Earth Sussex
Send your project details to request follow-up from Green Earth Sussex. Response timing and consultation terms are set by the company.
For Green Earth Sussex
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
Green Earth Sussex