G

Green Building Renewables Colchester in Colchester

Colchester·Solar Installation
ResidentialCommercial

17+ yrs

Experience

60 km

Service radius

11-50

Employees

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About Green Building Renewables Colchester

Award-winning in-house solar and heat pump installation team serving Colchester since 2009

Colchester, CO1 2ZF

Colchester CO1 2ZF

Services Offered

Solar InstallationBattery StorageEV ChargingMaintenanceEnergy Audit

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

MCSNICEICRECC

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

ColchesterChelmsfordIpswichBraintreeClacton-on-Sea

Customer Reviews

No reviews yet. Be the first to review Green Building Renewables Colchester!

Write a Review

Frequently Asked Questions

How do I get a quote from Green Building Renewables Colchester?

You can request a quote through the form on this page or contact Green Building Renewables Colchester directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Green Building Renewables Colchester serve?

Green Building Renewables Colchester is based in Colchester and serves within a 60 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Green Building Renewables Colchester hold?

This profile lists the following reported certifications: MCS, NICEIC, RECC. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Green Building Renewables Colchester offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Green Building Renewables Colchester for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Green Building Renewables Colchester for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Green Building Renewables Colchester handle permits and paperwork?

The exact scope is not verified on this profile. Ask Green Building Renewables Colchester which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded2009
Employees11-50
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Green Building Renewables Colchester

Send your project details to request follow-up from Green Building Renewables Colchester. Response timing and consultation terms are set by the company.

For Green Building Renewables Colchester

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
G

Green Building Renewables Colchester

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.