G

Going Green Renewables in Portsmouth

Portsmouth·Solar Installation
ResidentialCommercial

6+ yrs

Experience

80 km

Service radius

2-10

Employees

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About Going Green Renewables

GivEnergy advanced installer covering Hampshire with solar, battery storage, and EV charging solutions

Portsmouth, GU16 6BS

Portsmouth GU16 6BS

Services Offered

Solar InstallationBattery StorageEV ChargingMaintenanceMonitoring

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

MCSGivEnergy Advanced InstallerTrustMark

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

PortsmouthHampshireSurreyBerkshireFarnboroughGuildford

Customer Reviews

No reviews yet. Be the first to review Going Green Renewables!

Write a Review

Frequently Asked Questions

How do I get a quote from Going Green Renewables?

You can request a quote through the form on this page or contact Going Green Renewables directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Going Green Renewables serve?

Going Green Renewables is based in Portsmouth and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Going Green Renewables hold?

This profile lists the following reported certifications: MCS, GivEnergy Advanced Installer, TrustMark. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Going Green Renewables offer?

Warranty terms are not documented on this profile. Ask Going Green Renewables for the equipment, workmanship, exclusions, transfer, and claim terms in writing.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Going Green Renewables for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Going Green Renewables handle permits and paperwork?

The exact scope is not verified on this profile. Ask Going Green Renewables which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded2020
Employees2-10
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Going Green Renewables

Send your project details to request follow-up from Going Green Renewables. Response timing and consultation terms are set by the company.

For Going Green Renewables

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
G

Going Green Renewables

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.