Glow Green in Cardiff
13+ yrs
Experience
100 km
Service radius
51-200
Employees
Profile information
About Glow Green
Published directory profile for Glow Green in Cardiff. Verify services, credentials, ratings, and references directly with their original sources.
Cardiff, BH8 8EZ
Cardiff BH8 8EZ
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
10yr
Installation Warranty
Questions to Ask About Installation
Initial Consultation
Ask whether a site assessment is offered, what it covers, and whether it has a fee.
System Design
Request a design showing the proposed equipment, layout, assumptions, and itemized costs.
Permitting & Approval
Confirm who handles permits, inspections, and utility interconnection, and which fees are included.
Installation
Verify the installation team’s licenses, relevant certifications, and insurance.
Commissioning & Handover
Confirm the testing records, monitoring access, warranty registration, and support included in the handover.
Service Areas
Customer Reviews
No reviews yet. Be the first to review Glow Green!
Frequently Asked Questions
How do I get a quote from Glow Green?
You can request a quote through the form on this page or contact Glow Green directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does Glow Green serve?
Glow Green is based in Cardiff and serves within a 100 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does Glow Green hold?
This profile lists the following reported certifications: MCS, NICEIC, HIES. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does Glow Green offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Glow Green for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask Glow Green for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does Glow Green handle permits and paperwork?
The exact scope is not verified on this profile. Ask Glow Green which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Contact Information
Request a QuoteBusiness Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Similar Installers
Request a Quote from Glow Green
Send your project details to request follow-up from Glow Green. Response timing and consultation terms are set by the company.
For Glow Green
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
Glow Green