GE Solutions UK in Birmingham
18+ yrs
Experience
80 km
Service radius
11-50
Employees
Profile information
About GE Solutions UK
MCS-certified solar installers with over 25 years of experience serving Birmingham and the West Midlands
Birmingham, B61 0AE
Birmingham B61 0AE
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
10yr
Installation Warranty
Questions to Ask About Installation
Initial Consultation
Ask whether a site assessment is offered, what it covers, and whether it has a fee.
System Design
Request a design showing the proposed equipment, layout, assumptions, and itemized costs.
Permitting & Approval
Confirm who handles permits, inspections, and utility interconnection, and which fees are included.
Installation
Verify the installation team’s licenses, relevant certifications, and insurance.
Commissioning & Handover
Confirm the testing records, monitoring access, warranty registration, and support included in the handover.
Service Areas
Customer Reviews
No reviews yet. Be the first to review GE Solutions UK!
Frequently Asked Questions
How do I get a quote from GE Solutions UK?
You can request a quote through the form on this page or contact GE Solutions UK directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does GE Solutions UK serve?
GE Solutions UK is based in Birmingham and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does GE Solutions UK hold?
This profile lists the following reported certifications: MCS, NICEIC, RECC, ISO 9001, ISO 14001. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does GE Solutions UK offer?
This profile reports 10-year workmanship coverage. Ask GE Solutions UK for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask GE Solutions UK for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does GE Solutions UK handle permits and paperwork?
The exact scope is not verified on this profile. Ask GE Solutions UK which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Contact Information
Request a QuoteBusiness Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Similar Installers
Request a Quote from GE Solutions UK
Send your project details to request follow-up from GE Solutions UK. Response timing and consultation terms are set by the company.
For GE Solutions UK
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
GE Solutions UK