G

Gallagher Electrical in Birmingham

Birmingham·Solar Installation
ResidentialCommercial

36+ yrs

Experience

60 km

Service radius

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About Gallagher Electrical

Family-run NICEIC and MCS-approved electricians and solar installers with over 30 years of experience

Birmingham, DY6 7YB

Birmingham DY6 7YB

Services Offered

Solar InstallationBattery StorageEV Charging

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

MCSNICEIC

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

BirminghamKingswinfordDudleyWolverhamptonWalsallWest Bromwich

Customer Reviews

No reviews yet. Be the first to review Gallagher Electrical!

Write a Review

Frequently Asked Questions

How do I get a quote from Gallagher Electrical?

You can request a quote through the form on this page or contact Gallagher Electrical directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Gallagher Electrical serve?

Gallagher Electrical is based in Birmingham and serves within a 60 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Gallagher Electrical hold?

This profile lists the following reported certifications: MCS, NICEIC. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Gallagher Electrical offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Gallagher Electrical for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Gallagher Electrical for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Gallagher Electrical handle permits and paperwork?

The exact scope is not verified on this profile. Ask Gallagher Electrical which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded1990
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Gallagher Electrical

Send your project details to request follow-up from Gallagher Electrical. Response timing and consultation terms are set by the company.

For Gallagher Electrical

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
G

Gallagher Electrical

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.